Materials : Aluminium base channel, 17.52mm low-iron laminated glass
Timeline
Order Confirmation : Sep 2023
Delivery & Installation : 12 months
Handing Over : Sep 2024
Client : Mr. Sanjeev Nanda
Lead Consultant : M/s. Bureau of Engineering Studies Consulting Engineers
Design Architect : M/s. LW Design Group
Main Contractor : M/s. Walk Thru Building Contracting LLC
The design is fundamentally the original design concept which the client loved. The design allowed the spaces to be opened up even further to create beautiful vistas from all angles of the villa with water becoming an important reflection feature visible from all viewpoints.
Project Information: