Materials : Aluminium base profile 100mm x 72mm, 17.52mm clear laminated toughened glass,
50x30mm solid hardwood timber handrail
Timeline
Order Confirmation : Sep 2023
Delivery & Installation : 12 months
Handover : Sep 2024
Client : Mr. Dharmesh Adnani
Design Consultant : M/s. LW Design Group FZ-LLC
Consultant : M/s. Renaissance
Main Contractor : M/s. Bowyer Wick Building Contracting
Situated @ Pearl Jumeirah, Dubai. The client brief was to create a humble design with luxurious materials and fittings. The design allowed the spaces to be opened up even further to create beautiful vistas from all angles of the villa with water becoming an important reflection feature visible from all viewpoints.
Project Information: